New Roofs in Kingswinford
Full re-roofs done properly: stripped to the timbers, new membrane and battens, tiles or slates laid straight, dry ridge as standard. Around eight miles south of our base.
New Roofs for Homes in Kingswinford
The first re-roof wave is moving through Kingswinford estate by estate, and done properly it is a once-in-a-lifetime job for these houses. We strip the original tiles and felt, check the trussed timbers, and recover on breathable membrane with modern interlocking tiles rated for the pitch, dry verge and ridge throughout, so the next sixty years start on better materials than the first.
We cover Kingswinford and the surrounding area: Wall Heath, Summerhill, The Village green area, Charterfields, Bromley and beyond (DY6).
Get a Free Kingswinford Quote
What’s Included
Low pitches need respect at specification, not every tile is permitted at every angle, and we choose coverings that genuinely suit the roof rather than forcing a favourite. Neighbours in these uniform closes often book together once the first house goes, and the shared-scaffold savings are real.
- Stripped to the rafters, timbers checked and repaired
- Breathable membrane and treated battens throughout
- Concrete tile, clay tile, natural or fibre cement slate
- Dry ridge and dry verge systems as standard
- New lead flashings, chimney work while the scaffold is up
- Waste cleared daily, site left tidy
How It Works
New Roofs in Kingswinford, FAQs
Only tiles rated for your measured pitch, every profile has a minimum angle, and fitting below it is how new roofs leak in their first winter. We measure, shortlist the compliant options, and show you samples, the choice is real but it is made inside the rules.
If it is the same age, almost always, the flat or low section over the garage fails on the same clock as the main roof, and doing both under one scaffold and setup is markedly cheaper than two separate jobs a couple of years apart.
The felt is usually the decider. If the membrane under the tiles has gone brittle and torn across large areas, every repair is temporary because water finds the next tear. Widespread nail failure and constant slipped tiles point the same way. We will tell you straight which category your roof is in, and quote a repair instead if that is the honest answer.
A typical semi takes around a week from scaffold up to scaffold down, weather permitting. Bigger roofs, slate work and chimney rebuilds add time. You get a realistic timeline with the quote, not a guess.
Ridge and hip tiles were traditionally bedded on mortar, which cracks with the seasons and eventually lets tiles come loose. A dry ridge system clamps them mechanically with screws and brackets, allows the roof to breathe, and does not need rebedding every few years. It costs a little more on day one and saves money every year after.