New Roofs in Cannock
Full re-roofs done properly: stripped to the timbers, new membrane and battens, tiles or slates laid straight, dry ridge as standard. Around ten miles northeast of our base.
New Roofs for Homes in Cannock
The re-roof wave in Cannock is centred on its mid-century streets, the enormous stock built for the coalfield’s peak decades is reaching the end of its original tiles and felt together, street by street across Chadsmoor and Heath Hayes. Strip, breathable membrane, treated battens, modern tiles, dry-fixed perimeters, the full reset, done efficiently on these regular house types.
We cover Cannock and the surrounding area: Town centre, Hednesford side, Chadsmoor, Bridgtown, Heath Hayes and beyond (WS11, WS12).
Get a Free Cannock Quote
What’s Included
Chase-side specifications get the exposure treatment, upgraded fixings and mechanical perimeters as standard, because a recover at Pye Green that ignores the hill behind it is a future call-out with scaffolding. Terrace recovers near the centre keep their rows matched, as terraces should.
- Stripped to the rafters, timbers checked and repaired
- Breathable membrane and treated battens throughout
- Concrete tile, clay tile, natural or fibre cement slate
- Dry ridge and dry verge systems as standard
- New lead flashings, chimney work while the scaffold is up
- Waste cleared daily, site left tidy
How It Works
New Roofs in Cannock, FAQs
If your roof is original to a fifties or sixties build, it is in the window, and a free survey tells you where in the window. Some have years of honest repairs left; some are spending repair money on borrowed time, and we will show you which with photos.
They need the exposure acknowledged, clipped tiles, dry-fixed edges, membrane lapped for driven rain. It adds little on the day and removes the most common storm damage this side of town suffers.
The felt is usually the decider. If the membrane under the tiles has gone brittle and torn across large areas, every repair is temporary because water finds the next tear. Widespread nail failure and constant slipped tiles point the same way. We will tell you straight which category your roof is in, and quote a repair instead if that is the honest answer.
A typical semi takes around a week from scaffold up to scaffold down, weather permitting. Bigger roofs, slate work and chimney rebuilds add time. You get a realistic timeline with the quote, not a guess.
Ridge and hip tiles were traditionally bedded on mortar, which cracks with the seasons and eventually lets tiles come loose. A dry ridge system clamps them mechanically with screws and brackets, allows the roof to breathe, and does not need rebedding every few years. It costs a little more on day one and saves money every year after.